Pharma-grade packaging.Batch-traceable. Audit-ready.
Since 1991, All Tech Printpack has engineered monocartons, kappa boxes, and corrugated shippers to the specifications Indian pharma buyers demand — including batch coding, vendor code assistance, and full documentation on request.
Engineered to pharma spec.
Delivered on schedule.
Monocartons
Precision-cut, specification-matched, batch-traceable. SBS 250–400 GSM with full-colour printing, UV coating, foil stamping, and embossing — built to pharma spec and delivered to schedule.
MOQ 50,000 units · Lead time 10–14 days · In-house artwork support
Kappa Boxes
Rigid premium packaging for high-value pharma SKUs and exports. 2–3 mm kappa board with velvet-touch lamination, foil, and emboss finishing.
MOQ 1,000 units · Lead time 12–15 days
Multicolor Corrugated Boxes
3-ply and 5-ply outer cases engineered for transit. Offset-printed with die cut, stacked for truck and container loading.
MOQ 5,000 units · Lead time 7–10 days
Built for procurement.
Not just production.
In-house prepress + plate making
Full control from artwork to press — no outsourcing, no delays.
Vendor code creation support
We assist pharma buyers through the vendor registration and documentation process.
Plant audits welcome
Schedule a walk-through of our Derabassi facility any time. No advance notice needed.
Documentation package on request
Material specs, ink certifications, and quality records provided to verified buyers.
Machinery at our
Derabassi facility.
All production is in-house. No outsourced printing, no third-party die-cutting. Every carton that leaves our floor was made on our machines, under our QC.
Machinery list as of 2026. Full equipment specification available on request.
- Heidelberg SM74 4-colour offset press
- Heidelberg GTO 2-colour offset press
- Bobst autoplaten die-cutter
- In-house prepress and plate-making station
- Folder-gluer line
- UV coating unit
- In-line quality inspection
Let's start the vendor evaluation.
Send us your specifications or request a vendor kit with everything your procurement team needs. First response within one business day.